FLAT ROOF REPLACEMENT


Before
EPDM system original to the building that has failed after numerous patchwork and thousands of dollars spent. The owner decided it’s time to replace the roof, 2 ply SBS system was recommended.
.
After
Mechanically attached cement board, 2 ply system installed on the flat surface with the liquid membrane applied on the wall flashing and all penetrations (pipes, vents, etc.)15 year warranty was issued to the owner.
EXPLORE OUR STUNNING ROOFS









BROWNSTONE ROOF REPLACEMENT


Before
Decades old properly done roof that withstood the test of time is slowly deteriorating .Cracks and uv rays damage is seen,roof layover was recommended.
After
Granules in the sbs system help to protect the membrane from excessive sun exposure.Sbs system was directly applied over the existing membrane using glue adhesive,liquid membrane was then applied on the wall flashing and all penetrations.15 year warranty was issued to the owner.
TERRACE MAKEOVER


Before
Leaking roof with rubber pavers. Installation of rubber pavers directly on the roof without pedestals slows down drainage causing the membrane seams to crack.Full roof replacement was recommended.
After
Soprema liquid system was recommended ,20 year ndl manufacture warranty was issued,Decorative porcelain pavers on adjustable pedestals were installed for better water drainage.


Before
After
WATERPROOFING



Before
Previous contractor used the wrong material for the job, blueskin material is not to be used for areas where water can pool.The seams failed causing water to enter the floor below.
During work
Removal of old waterproofing membrane ,scarifier grinding of concrete ,prep work for application of seamless liquid applied system.
After
Soprema liquid system was successfully applied,24 hour water test completed.
STEEL POOL WATERPROOFING



Before
Steel welding connections failed to cause a major leak to the floors below.
During work
Soprema alsan product was recommended. The surface was cleaned and primed using special metal primer, All steel connections were reinforced with 4-inch liquid strip.
After
Soprema alsan with fleece fabric was applied over steel area.Texture was applied for better tile application,24 hour water test was completed.
WATERPROOFING


Before
Landmark property basement access hatch.Old failing design causes multiply leaks to property basement.
After
Access hatch was properly scraped and cleaned from old paint and rust, Liquid membrane was then applied with a coat of paint to retain the original landmark look.
GALVANIZED SKYLIGHT


Befor
Old plastic dome skylight kept leaking after numerous repairs.Client decided to replace it with a traditional galvanized skylight.
After
Galvanized hip vent skylight was recommended along with a new 8 inch curb.Curb was properly waterproof using liquid applied membrane.Skylight was then installed to the new curb.


Before
Client decided he wants more natural sunlight in his apartment,old access hatch opening were used for new skylight curb.
After
Old access hatch removed, new framing and curb install, liquid membrane applied to seal of the elements. Velux skylight installed over new curb.
GARAGE FLOOR WATERPROOFING



Before
During work
After

Roof penetrations are the most important waterproofing details, improper waterproofing can compromise roof reliability, before hiring a roofing company make sure your roofer is knowledgeable and use high-end products, to solve the most difficult waterproofing problems.
ROOF DETAILS WATERPROOFING
Outdoor kitchen penetrations
Commercial laundry vents
Hvac penetrations



Hvac curb stands
Drains and gutters
Railings